Key Technical Information

Review the main specifications, condition, location, availability and supporting details for this offer.

The latest supplied HMI image dated 29 July 2026 shows the turbine operating at 24.3 MW and records 76,407.4 total fired hours. An earlier HMI image dated 11 March 2026 shows 24.3 MW and 75,206.8 total fired hours, while the source proposal states 75,206 hours. Maintenance history supplied with the offer records installation in 2007; combustion inspections in 2009, 2013 and 2017; hot-gas-path inspections in 2011 and 2020; a major inspection plus upgrade to Dry Low NOx combustion in 2015; and combustion plus borescope inspection in 2023. The maintenance schedule notes turbine removal and replacement with new in 2026.

Application: Industrial gas-turbine power generation / mechanical-drive or power-generation applications subject to final configuration verification

Technical specifications

ManufacturerBaker Hughes
Turbine typeFrame 5/2C two-shaft
Nominal output28.3 MW
Serial number226238
ConditionUsed
Combustion systemDry Low NOx installed
Upgrade kitExtender III installed
Latest total fired time76,407.4 hours; 29-Jul-2026 HMI
Earlier total fired time75,206.8 hours; 11-Mar-2026 HMI
Displayed operating power24.3 MW
Installation on site2007 maintenance history
Major inspection / DLN upgrade2015 maintenance history
Last HGP inspection2020 maintenance history
Last CI + borescope inspection2023 maintenance history

Technical preview · copying/printing is discouraged. Screenshot prevention cannot be guaranteed on the open web.

Included equipment / scope

Baker Hughes Frame 5/2C two-shaft gas turbine, serial no. 226238, with installed Dry Low NOx combustion system and Extender III kit. Final included auxiliaries, controls, generator/load equipment, loose parts, preservation scope and shipping scope to be confirmed.

Documents available

Commercial proposal; operating HMI photographs; maintenance history image; equipment photographs

Related live offers

Request Price →

No exact match?

Tell us what you need.

If the right equipment or technical offer is not currently listed, submit your requirement and let SourceLane review the next practical sourcing step.

Submit a Requirement →